How accurate are we, honestly? Every figure below is validated leakage-free and point-in-time — the same discipline the engine is built on.
5,354 projects · 700 firms · 961,456 bid lines · 2024-06-02 – 2026-11-19
Half of our project totals landed closer to the winning bid than this, half further. A single line item misses by more (see below), but line misses partly cancel across a job, so the total lands closer.
All 233 projects we priced before bids opened and scored once the winning bid posted, newest letting first. Hits and misses alike. Difference: + means we priced above the winning bid, − below it.
| Project | Where | Letting | We priced | Winning bid | Difference |
|---|---|---|---|---|---|
| 1052-02-098 | Corpus Christi, Texas | Nov 2026 | $4.53M | $3.83M | +18% |
| 1017-03-040 | Paris, Texas | Nov 2026 | $6.24M | $6.80M | -8% |
| 0947-03-034 | Beaumont, Texas | Nov 2026 | $2.19M | $2.43M | -10% |
| 0923-06-068 | Brownwood, Texas | Nov 2026 | $1.55M | $1.56M | -1% |
| 0922-33-234 | Laredo, Texas | Nov 2026 | $3.02M | $2.87M | +5% |
| 0500-01-158 | Houston, Texas | Nov 2026 | $191K | $607K | -69% |
| 0353-01-031 | Fort Worth, Texas | Nov 2026 | $500K | $482K | +4% |
| 0285-03-066 | Austin, Texas | Nov 2026 | $837K | $950K | -12% |
| 0262-01-034 | Bryan, Texas | Nov 2026 | $11.52M | $9.79M | +18% |
| 0212-03-058 | Bryan, Texas | Nov 2026 | $36.09M | $30.21M | +20% |
| 0195-02-092 | Dallas, Texas | Nov 2026 | $145.67M | $138.15M | +5% |
| 0157-04-058 | Abilene, Texas | Nov 2026 | $6.85M | $6.73M | +2% |
| 0074-06-256 | Corpus Christi, Texas | Nov 2026 | $803K | $850K | -6% |
| 0066-03-045 | Amarillo, Texas | Nov 2026 | $15.98M | $18.30M | -13% |
| 0052-04-054 | Lubbock, Texas | Nov 2026 | $20.74M | $22.30M | -7% |
| 0047-04-032 | Dallas, Texas | Nov 2026 | $35.88M | $35.77M | +0% |
| 0027-03-077 | Yoakum, Texas | Nov 2026 | $14.79M | $17.60M | -16% |
| 0016-03-125 | Austin, Texas | Nov 2026 | $3.38M | $2.80M | +21% |
| 0009-06-056 | Paris, Texas | Nov 2026 | $14.82M | $14.22M | +4% |
| 0007-05-016 | Brownwood, Texas | Nov 2026 | $9.40M | $9.33M | +1% |
| 3330-01-011 | Waco, Texas | Nov 2026 | $287K | $291K | -2% |
| 2552-01-062 | El Paso, Texas | Nov 2026 | $12.68M | $11.85M | +7% |
| 0919-00-108 | Atlanta, Texas | Nov 2026 | $741K | $877K | -16% |
| 0917-30-068 | Bryan, Texas | Nov 2026 | $717K | $722K | -1% |
| 0914-00-506 | Austin, Texas | Nov 2026 | $1.82M | $1.57M | +15% |
| 0901-00-066 | Paris, Texas | Nov 2026 | $3.69M | $3.52M | +5% |
| 0619-03-068 | Dallas, Texas | Nov 2026 | $1.74M | $1.53M | +14% |
| 0616-01-020 | Corpus Christi, Texas | Nov 2026 | $487K | $471K | +3% |
| 0271-06-141 | Houston, Texas | Nov 2026 | $1.69M | $1.15M | +47% |
| 0220-01-038 | Pharr, Texas | Nov 2026 | $11.98M | $11.56M | +4% |
| 0168-09-191 | Amarillo, Texas | Nov 2026 | $4.06M | $5.80M | -30% |
| 0059-05-048 | Lufkin, Texas | Nov 2026 | $9.33M | $10.73M | -13% |
| 0054-05-027 | Brownwood, Texas | Nov 2026 | $3.45M | $2.93M | +18% |
| 0045-09-113 | Paris, Texas | Nov 2026 | $3.48M | $3.51M | -1% |
| 0044-06-079 | Wichita Falls, Texas | Nov 2026 | $12.30M | $12.17M | +1% |
| 0038-01-107 | Laredo, Texas | Nov 2026 | $1.58M | $1.49M | +6% |
| 0022-03-032 | Odessa, Texas | Nov 2026 | $2.32M | $2.89M | -20% |
| 0015-13-432 | Austin, Texas | Nov 2026 | $216.66M | $412.23M | -47% |
| 0008-02-078 | Fort Worth, Texas | Nov 2026 | $584K | $495K | +18% |
| 1137-02-044 | Pharr, Texas | Oct 2026 | $75K | $103K | -27% |
| 0922-20-030 | Laredo, Texas | Oct 2026 | $529K | $485K | +9% |
| 0921-02-527 | Pharr, Texas | Oct 2026 | $668K | $1.12M | -40% |
| 0912-72-848 | Houston, Texas | Oct 2026 | $2.69M | $4.06M | -34% |
| 0907-00-217 | San Angelo, Texas | Oct 2026 | $2.97M | $2.54M | +17% |
| 0906-00-295 | Odessa, Texas | Oct 2026 | $665K | $900K | -26% |
| 0510-06-024 | Paris, Texas | Oct 2026 | $8.38M | $9.77M | -14% |
| 0303-04-039 | Childress, Texas | Oct 2026 | $5.84M | $6.26M | -7% |
| 0200-01-093 | Lufkin, Texas | Oct 2026 | $23.67M | $31.80M | -26% |
| 0196-03-288 | Dallas, Texas | Oct 2026 | $1.01M | $1.18M | -14% |
| 0143-03-049 | San Antonio, Texas | Oct 2026 | $54.47M | $39.88M | +37% |
| 0092-05-058 | Dallas, Texas | Oct 2026 | $12.74M | $13.62M | -6% |
| 0092-03-064 | Dallas, Texas | Oct 2026 | $4.23M | $3.76M | +13% |
| 0092-02-145 | Dallas, Texas | Oct 2026 | $30.60M | $29.88M | +2% |
| 0067-17-039 | Amarillo, Texas | Oct 2026 | $3.24M | $3.90M | -17% |
| 0049-14-015 | Bryan, Texas | Oct 2026 | $19.77M | $19.13M | +3% |
| 0022-01-034 | Odessa, Texas | Oct 2026 | $6.21M | $6.77M | -8% |
| 0014-23-041 | Waco, Texas | Oct 2026 | $14.30M | $10.90M | +31% |
| 2502-01-024 | Waco, Texas | Oct 2026 | $21.94M | $22.05M | -0% |
| 1414-03-043 | Houston, Texas | Oct 2026 | $880K | $975K | -10% |
| 0911-00-188 | Lufkin, Texas | Oct 2026 | $1.46M | $3.27M | -55% |
| 0669-01-070 | Pharr, Texas | Oct 2026 | $533K | $442K | +21% |
| 0590-05-057 | Bryan, Texas | Oct 2026 | $246K | $257K | -4% |
| 0410-02-047 | Paris, Texas | Oct 2026 | $15.40M | $9.88M | +56% |
| 0387-01-016 | Dallas, Texas | Oct 2026 | $6.95M | $4.91M | +42% |
| 0249-02-026 | Wichita Falls, Texas | Oct 2026 | $3.59M | $3.68M | -3% |
| 0204-01-075 | Austin, Texas | Oct 2026 | $525K | $344K | +52% |
| 0168-03-040 | Lubbock, Texas | Oct 2026 | $1.95M | $1.70M | +15% |
| 0095-03-100 | Dallas, Texas | Oct 2026 | $51.55M | $55.01M | -6% |
| 0086-11-054 | Corpus Christi, Texas | Oct 2026 | $10.35M | $11.65M | -11% |
| 0010-08-061 | Atlanta, Texas | Oct 2026 | $11.00M | $11.97M | -8% |
| 0009-11-248 | Dallas, Texas | Oct 2026 | $48.59M | $54.38M | -11% |
| 1801-01-064 | Pharr, Texas | Sep 2026 | $381K | $418K | -9% |
| 1505-01-016 | Pharr, Texas | Sep 2026 | $10.14M | $9.60M | +6% |
| 1479-01-028 | San Antonio, Texas | Sep 2026 | $3.56M | $3.45M | +3% |
| 1414-01-025 | Houston, Texas | Sep 2026 | $1.00M | $1.49M | -33% |
| 0918-00-440 | Dallas, Texas | Sep 2026 | $4.45M | $4.19M | +6% |
| 0917-31-036 | Bryan, Texas | Sep 2026 | $1.08M | $1.14M | -5% |
| 0902-39-050 | Fort Worth, Texas | Sep 2026 | $345K | $412K | -16% |
| 0901-19-198 | Paris, Texas | Sep 2026 | $2.01M | $2.13M | -6% |
| 0844-04-011 | Childress, Texas | Sep 2026 | $2.86M | $3.02M | -5% |
| 0722-03-016 | Paris, Texas | Sep 2026 | $1.59M | $1.47M | +8% |
| 0573-02-008 | Austin, Texas | Sep 2026 | $5.80M | $5.11M | +14% |
| 0275-03-072 | Amarillo, Texas | Sep 2026 | $8.98M | $9.90M | -9% |
| 0228-05-072 | Odessa, Texas | Sep 2026 | $17.82M | $17.18M | +4% |
| 0221-09-039 | Atlanta, Texas | Sep 2026 | $976K | $1.10M | -11% |
| 0187-05-068 | Houston, Texas | Sep 2026 | $2.33M | $2.93M | -21% |
| 0101-01-070 | Corpus Christi, Texas | Sep 2026 | $2.05M | $1.87M | +10% |
| 0068-05-039 | Lubbock, Texas | Sep 2026 | $3.94M | $3.99M | -1% |
| 0056-02-034 | Waco, Texas | Sep 2026 | $7.84M | $8.16M | -4% |
| 0047-06-178 | Dallas, Texas | Sep 2026 | $2.94M | $2.84M | +4% |
| 0039-10-095 | Pharr, Texas | Sep 2026 | $4.48M | $4.54M | -1% |
| 0028-05-057 | Beaumont, Texas | Sep 2026 | $10.61M | $11.07M | -4% |
| 0001-01-075 | El Paso, Texas | Sep 2026 | $3.02M | $3.62M | -17% |
| 3632-01-002 | Pharr, Texas | Sep 2026 | $57.06M | $51.36M | +11% |
| 0976-03-120 | Houston, Texas | Sep 2026 | $342K | $374K | -8% |
| 0921-02-526 | Pharr, Texas | Sep 2026 | $153K | $193K | -21% |
| 0915-11-037 | San Antonio, Texas | Sep 2026 | $688K | $659K | +4% |
| 0913-09-134 | Yoakum, Texas | Sep 2026 | $2.64M | $2.68M | -2% |
| 0903-28-073 | Wichita Falls, Texas | Sep 2026 | $2.51M | $2.80M | -10% |
| 0902-00-368 | Fort Worth, Texas | Sep 2026 | $3.47M | $3.64M | -5% |
| 0873-01-029 | Pharr, Texas | Sep 2026 | $3.32M | $3.42M | -3% |
| 0865-01-118 | Pharr, Texas | Sep 2026 | $455K | $583K | -22% |
| 0600-01-013 | Odessa, Texas | Sep 2026 | $6.61M | $6.68M | -1% |
| 0549-02-038 | Paris, Texas | Sep 2026 | $2.72M | $1.98M | +37% |
| 0427-01-042 | Paris, Texas | Sep 2026 | $1.81M | $1.79M | +1% |
| 0337-03-020 | Austin, Texas | Sep 2026 | $2.93M | $2.17M | +34% |
| 0276-04-033 | Laredo, Texas | Sep 2026 | $7.78M | $8.14M | -4% |
| 0185-01-046 | Waco, Texas | Sep 2026 | $4.14M | $4.78M | -13% |
| 0173-04-063 | Dallas, Texas | Sep 2026 | $1.25M | $961K | +30% |
| 0172-09-047 | Fort Worth, Texas | Sep 2026 | $3.21M | $2.62M | +22% |
| 0110-06-151 | Houston, Texas | Sep 2026 | $1.07M | $1.20M | -11% |
| 0086-07-038 | Pharr, Texas | Sep 2026 | $3.67M | $3.92M | -6% |
| 0050-09-099 | Houston, Texas | Sep 2026 | $4.12M | $4.40M | -6% |
| 0043-17-036 | Wichita Falls, Texas | Sep 2026 | $777K | $1.03M | -25% |
| 3534-01-021 | Waco, Texas | Aug 2026 | $4.64M | $4.09M | +13% |
| 3510-04-069 | Houston, Texas | Aug 2026 | $36.52M | $32.67M | +12% |
| 2552-04-055 | El Paso, Texas | Aug 2026 | $6.91M | $7.00M | -1% |
| 2528-01-006 | Odessa, Texas | Aug 2026 | $7.03M | $8.60M | -18% |
| 2158-01-020 | Tyler, Texas | Aug 2026 | $20.30M | $17.96M | +13% |
| 1228-03-052 | Pharr, Texas | Aug 2026 | $530K | $662K | -20% |
| 1197-01-027 | Austin, Texas | Aug 2026 | $3.27M | $3.44M | -5% |
| 0920-39-033 | Beaumont, Texas | Aug 2026 | $1.48M | $1.68M | -12% |
| 0920-39-028 | Beaumont, Texas | Aug 2026 | $212K | $224K | -6% |
| 0914-18-130 | Austin, Texas | Aug 2026 | $298K | $224K | +33% |
| 0914-00-581 | Austin, Texas | Aug 2026 | $309K | $308K | +0% |
| 0911-28-082 | Lufkin, Texas | Aug 2026 | $1.16M | $2.81M | -59% |
| 0911-00-161 | Lufkin, Texas | Aug 2026 | $417K | $453K | -8% |
| 0910-00-165 | Tyler, Texas | Aug 2026 | $815K | $655K | +24% |
| 0906-32-067 | Odessa, Texas | Aug 2026 | $1.87M | $2.08M | -10% |
| 0902-00-323 | Fort Worth, Texas | Aug 2026 | $1.12M | $1.05M | +7% |
| 0901-21-022 | Paris, Texas | Aug 2026 | $1.50M | $1.49M | +0% |
| 0842-03-037 | Yoakum, Texas | Aug 2026 | $27.83M | $25.00M | +11% |
| 0610-05-060 | Atlanta, Texas | Aug 2026 | $11.48M | $10.63M | +8% |
| 0581-01-177 | Dallas, Texas | Aug 2026 | $1.86M | $2.14M | -13% |
| 0541-02-033 | Childress, Texas | Aug 2026 | $7.75M | $9.48M | -18% |
| 0535-02-050 | San Antonio, Texas | Aug 2026 | $5.31M | $5.75M | -8% |
| 0500-03-664 | Houston, Texas | Aug 2026 | $5.02M | $5.09M | -1% |
| 0420-01-051 | Yoakum, Texas | Aug 2026 | $5.21M | $5.35M | -3% |
| 0364-05-043 | Fort Worth, Texas | Aug 2026 | $664K | $698K | -5% |
| 0363-03-061 | Fort Worth, Texas | Aug 2026 | $3.55M | $3.20M | +11% |
| 0327-06-031 | Pharr, Texas | Aug 2026 | $2.57M | $2.39M | +8% |
| 0314-07-070 | Fort Worth, Texas | Aug 2026 | $16.42M | $15.70M | +5% |
| 0283-02-040 | Wichita Falls, Texas | Aug 2026 | $12.72M | $13.04M | -2% |
| 0276-01-044 | Laredo, Texas | Aug 2026 | $11.18M | $8.82M | +27% |
| 0252-03-056 | Austin, Texas | Aug 2026 | $2.69M | $2.42M | +11% |
| 0208-01-026 | Atlanta, Texas | Aug 2026 | $3.40M | $3.32M | +2% |
| 0168-03-038 | Lubbock, Texas | Aug 2026 | $4.10M | $9.76M | -58% |
| 0140-13-023 | San Angelo, Texas | Aug 2026 | $11.03M | $13.74M | -20% |
| 0114-10-102 | Bryan, Texas | Aug 2026 | $4.83M | $4.29M | +13% |
| 0092-06-112 | Dallas, Texas | Aug 2026 | $493K | $481K | +2% |
| 0083-02-060 | Paris, Texas | Aug 2026 | $53K | $48K | +10% |
| 0069-07-113 | San Angelo, Texas | Aug 2026 | $1.96M | $2.83M | -30% |
| 0051-09-128 | Houston, Texas | Aug 2026 | $3.40M | $2.10M | +62% |
| 0041-07-121 | Amarillo, Texas | Aug 2026 | $23.71M | $30.09M | -21% |
| 0027-10-074 | Houston, Texas | Aug 2026 | $1.36M | $2.46M | -45% |
| 0025-02-234 | San Antonio, Texas | Aug 2026 | $7.03M | $7.90M | -11% |
| 3510-04-070 | Houston, Texas | Aug 2026 | $29.16M | $25.95M | +12% |
| 2635-05-005 | Amarillo, Texas | Aug 2026 | $44.01M | $42.22M | +4% |
| 1756-01-024 | Yoakum, Texas | Aug 2026 | $1.02M | $1.00M | +2% |
| 1685-05-140 | Houston, Texas | Aug 2026 | $2.03M | $1.83M | +11% |
| 1586-01-085 | Pharr, Texas | Aug 2026 | $6.41M | $6.37M | +0% |
| 1023-01-039 | Beaumont, Texas | Aug 2026 | $2.21M | $2.50M | -12% |
| 0991-02-014 | Corpus Christi, Texas | Aug 2026 | $10.84M | $8.34M | +30% |
| 0922-00-080 | Laredo, Texas | Aug 2026 | $1.85M | $2.04M | -10% |
| 0921-02-525 | Pharr, Texas | Aug 2026 | $654K | $757K | -14% |
| 0920-00-168 | Beaumont, Texas | Aug 2026 | $1.29M | $1.17M | +10% |
| 0919-00-098 | Atlanta, Texas | Aug 2026 | $331K | $119K | +178% |
| 0918-47-401 | Dallas, Texas | Aug 2026 | $132K | $2.62M | -95% |
| 0917-16-040 | Bryan, Texas | Aug 2026 | $2.25M | $2.57M | -12% |
| 0916-00-254 | Corpus Christi, Texas | Aug 2026 | $6.11M | $4.76M | +28% |
| 0915-12-820 | San Antonio, Texas | Aug 2026 | $682K | $758K | -10% |
| 0913-28-101 | Yoakum, Texas | Aug 2026 | $628K | $1.62M | -61% |
| 0909-00-074 | Waco, Texas | Aug 2026 | $1.61M | $1.52M | +6% |
| 0907-00-239 | San Angelo, Texas | Aug 2026 | $479K | $589K | -19% |
| 0902-90-286 | Fort Worth, Texas | Aug 2026 | $482K | $498K | -3% |
| 0902-38-134 | Fort Worth, Texas | Aug 2026 | $1.74M | $1.53M | +14% |
| 0902-00-336 | Fort Worth, Texas | Aug 2026 | $2.42M | $2.19M | +10% |
| 0901-29-100 | Paris, Texas | Aug 2026 | $895K | $801K | +12% |
| 0784-02-011 | Beaumont, Texas | Aug 2026 | $3.12M | $3.28M | -5% |
| 0441-09-054 | Odessa, Texas | Aug 2026 | $21.21M | $14.98M | +42% |
| 0320-05-018 | Waco, Texas | Aug 2026 | $547K | $523K | +5% |
| 0276-07-035 | San Antonio, Texas | Aug 2026 | $7.62M | $7.43M | +3% |
| 0249-08-046 | Fort Worth, Texas | Aug 2026 | $210K | $181K | +16% |
| 0222-03-065 | Atlanta, Texas | Aug 2026 | $11.75M | $10.76M | +9% |
| 0204-06-069 | Bryan, Texas | Aug 2026 | $349K | $366K | -5% |
| 0186-03-071 | Bryan, Texas | Aug 2026 | $5.86M | $4.99M | +18% |
| 0173-04-059 | Dallas, Texas | Aug 2026 | $6.62M | $6.24M | +6% |
| 0150-02-043 | Austin, Texas | Aug 2026 | $2.61M | $2.46M | +6% |
| 0132-03-036 | Childress, Texas | Aug 2026 | $26.83M | $28.76M | -7% |
| 0114-02-112 | Austin, Texas | Aug 2026 | $7.17M | $8.58M | -16% |
| 0095-04-079 | Dallas, Texas | Aug 2026 | $1.06M | $800K | +33% |
| 0092-06-111 | Dallas, Texas | Aug 2026 | $3.91M | $5.41M | -28% |
| 0089-07-166 | Yoakum, Texas | Aug 2026 | $163.22M | $185.83M | -12% |
| 0050-06-108 | Houston, Texas | Aug 2026 | $1.55M | $1.42M | +9% |
| 0050-05-071 | Houston, Texas | Aug 2026 | $4.33M | $3.89M | +11% |
| 0047-03-106 | Paris, Texas | Aug 2026 | $982K | $993K | -1% |
| 0037-02-060 | Laredo, Texas | Aug 2026 | $13.63M | $13.79M | -1% |
| 0027-08-147 | Houston, Texas | Aug 2026 | $49.10M | $48.83M | +1% |
| 0014-15-034 | Fort Worth, Texas | Aug 2026 | $53.79M | $66.14M | -19% |
| 0014-03-103 | Fort Worth, Texas | Aug 2026 | $2.74M | $2.80M | -2% |
| 0013-08-154 | Fort Worth, Texas | Aug 2026 | $2.02M | $1.24M | +63% |
| 0013-05-046 | Wichita Falls, Texas | Aug 2026 | $10.25M | $11.18M | -8% |
| 6500-67-001 | El Paso, Texas | Jul 2026 | $266K | $426K | -38% |
| 0978-01-045 | Houston, Texas | Jul 2026 | $814K | $2.17M | -62% |
| 0915-12-751 | San Antonio, Texas | Jul 2026 | $6.80M | $3.30M | +106% |
| 0906-00-263 | Odessa, Texas | Jul 2026 | $718K | $688K | +4% |
| 0520-09-057 | Tyler, Texas | Jul 2026 | $92K | $165K | -44% |
| 0508-02-140 | Beaumont, Texas | Jul 2026 | $3.99M | $3.33M | +20% |
| 0314-04-036 | Fort Worth, Texas | Jul 2026 | $466K | $1.36M | -66% |
| 0311-01-019 | Childress, Texas | Jul 2026 | $354K | $747K | -52% |
| 0291-10-117 | San Antonio, Texas | Jul 2026 | $3.68M | $4.13M | -11% |
| 0266-04-053 | Yoakum, Texas | Jul 2026 | $4.04M | $4.78M | -16% |
| 0265-03-054 | Austin, Texas | Jul 2026 | $834K | $1.10M | -24% |
| 0091-06-061 | Dallas, Texas | Jul 2026 | $4.61M | $5.96M | -23% |
| 0072-12-202 | San Antonio, Texas | Jul 2026 | $324K | $330K | -2% |
| 0057-03-052 | Bryan, Texas | Jul 2026 | $388K | $1.30M | -70% |
| 0054-06-113 | Brownwood, Texas | Jul 2026 | $2.40M | $2.31M | +4% |
| 0009-11-269 | Dallas, Texas | Jul 2026 | $811K | $4.69M | -83% |
| 3510-04-066 | Houston, Texas | Jul 2026 | $18.47M | $19.51M | -5% |
| 1392-03-017 | Dallas, Texas | Jul 2026 | $2.98M | $4.38M | -32% |
| 0918-00-466 | Dallas, Texas | Jul 2026 | $330K | $421K | -22% |
| 0915-12-782 | San Antonio, Texas | Jul 2026 | $461K | $1.26M | -63% |
| 0540-03-039 | Bryan, Texas | Jul 2026 | $4.43M | $3.77M | +18% |
| 0229-01-042 | Odessa, Texas | Jul 2026 | $48.09M | $53.66M | -10% |
| 0211-10-053 | Yoakum, Texas | Jul 2026 | $1.61M | $1.63M | -1% |
| 0199-01-090 | Tyler, Texas | Jul 2026 | $908K | $1.09M | -17% |
| 0187-05-066 | Houston, Texas | Jul 2026 | $281K | $637K | -56% |
| 0143-01-068 | San Antonio, Texas | Jul 2026 | $2.39M | $2.31M | +3% |
| 0117-01-062 | Bryan, Texas | Jul 2026 | $422K | $858K | -51% |
| 0088-02-063 | Corpus Christi, Texas | Jul 2026 | $3.06M | $2.13M | +43% |
| 0070-03-062 | San Angelo, Texas | Jul 2026 | $3.04M | $2.66M | +14% |
| 0016-05-128 | San Antonio, Texas | Jul 2026 | $10.27M | $12.03M | -15% |
| 0007-06-268 | Brownwood, Texas | Jul 2026 | $889K | $1.03M | -14% |
Leave-one-project-out and point-in-time: every line priced only from lettings that closed before it, then compared to the unit price that actually won. No look-ahead, no cherry-picking.
The error should fall as the confidence we report rises. It does — which is what makes the confidence score worth acting on.
| Reported confidence | lines | typical miss | ≤20% | ≤35% |
|---|---|---|---|---|
| 0–30% | 276 | 44% | 29% | 42% |
| 30–50% | 1,723 | 36% | 32% | 49% |
| 50–70% | 1,079 | 23% | 46% | 66% |
| 70–90% | 85 | 19% | 53% | 72% |
| 90–100% | 7 | 32% | 14% | 57% |
On held-out contracts: when we say “X% chance of being the low bidder,” bidding there actually wins about X% of the time. 300 contracts, median 5 bidders per job.
| We predicted | Actually won | n |
|---|---|---|
| 29% | 30% | 120 |
| 39% | 35% | 120 |
| 46% | 46% | 120 |
| 58% | 57% | 120 |
| 66% | 68% | 120 |
| 78% | 74% | 120 |
Our modeled strength of the likely field tracks the bid that actually won — correlation r = 0.55 across 4,802 projects. Stronger fields (top) really do drive lower winning bids — which is what makes the opponent-aware odds trustworthy.
| Modeled field strength | Realized winning bid (÷ EE) |
|---|---|
| 0.79 | 0.70 |
| 0.92 | 0.84 |
| 1.00 | 0.89 |
| 1.07 | 0.93 |
| 1.18 | 1.01 |
The honest test, run continuously: predictions locked before bids open, then scored when the real bids post. 51 prediction(s) locked and awaiting results; 233 scored so far. This ledger grows every week — accuracy you can watch accumulate, not just a backtest.
Generated 2026-11-23 · refreshed weekly by the validation flywheel.