Heavy-civil bid intelligence · Built for every state DOT

Price every line.
Prove every number.

ListObidz reads the DOT's Estimate & Quantity Sheet and prices each item against 960,000 real DOT bids in seconds — highways, bridges, earthwork. Every figure carries its reasoning, never a black box.

Texas · liveFlorida · coming soon
Scroll
Latest results
Corpus Christi, Texas · Nov 2026  we priced $4.53M · won at $3.83M (+18%)Paris, Texas · Nov 2026  we priced $6.24M · won at $6.80M (-8%)Beaumont, Texas · Nov 2026  we priced $2.19M · won at $2.43M (-10%)Brownwood, Texas · Nov 2026  we priced $1.55M · won at $1.56M (-1%)Laredo, Texas · Nov 2026  we priced $3.02M · won at $2.87M (+5%)Houston, Texas · Nov 2026  we priced $191K · won at $607K (-69%)Fort Worth, Texas · Nov 2026  we priced $500K · won at $482K (+4%)Austin, Texas · Nov 2026  we priced $837K · won at $950K (-12%)Bryan, Texas · Nov 2026  we priced $11.52M · won at $9.79M (+18%)Bryan, Texas · Nov 2026  we priced $36.09M · won at $30.21M (+20%)Dallas, Texas · Nov 2026  we priced $145.67M · won at $138.15M (+5%)Abilene, Texas · Nov 2026  we priced $6.85M · won at $6.73M (+2%)
All 233 →
961,456
bid-line records
5,354
DOT projects in our history
700
contractors tracked
What it does

The whole bid history, behind every number.

Drop a CSJ or a plan set. We pull it straight from the DOT, read the quantity sheet, and hand back a priced bid where every line is defensible — with the comparables, the confidence, and the odds.

01 / PROVENANCE

Never a black box

Every line shows its comparable awards, a confidence score, and an ~80% likely-price range — so you know exactly which numbers to trust.

360-6001 · CONC PVMT$29.57 /SY
  • › 10 winning awards · Austin district
  • › qty band 8k–22k SY · conf 0.71
02 / STRATEGY

Know your odds

Win-probability built from the real all-bidder spread — plus the bid that maximizes expected profit, adjusted for the field you're up against.

bid $1.14M61% win
03 / COMPETITION

Know the field

Who bids this district and this kind of work, how aggressive they run, who's won it before — and who's quietly changing how they bid.

Lone Star Paving · won 20 Hunter Ind. · 27% Texas Materials · 26% +7 more
04 / YOUR TAKEOFF

Your quantities, re-priced live

The DOT sheet is a starting point. Edit any quantity with your own takeoff and the engine re-prices instantly — volume curves and all.

9,373→15,373 +64% · unit −14% (volume) · line +$113,948
How it works

From CSJ to a defensible bid.

01

Name the job

Pick your state, type the project number or drop the plan set. Pick the district — it drives the pricing.

02

We read the sheet

We pull the plan from the DOT and extract the Estimate & Quantity Sheet — no PDF to hunt through.

03

Priced, with reasoning

Every line priced from history, a win-probability, the likely field, and pre-submit checks.

Our latest results

All 233 results →
ProjectWhereLettingWe pricedWinning bidDifference
1052-02-098Corpus Christi, TexasNov 2026$4.53M$3.83M+18%
1017-03-040Paris, TexasNov 2026$6.24M$6.80M-8%
0947-03-034Beaumont, TexasNov 2026$2.19M$2.43M-10%
0923-06-068Brownwood, TexasNov 2026$1.55M$1.56M-1%
0922-33-234Laredo, TexasNov 2026$3.02M$2.87M+5%
0500-01-158Houston, TexasNov 2026$191K$607K-69%

The 6 most recent lettings we priced, hits and misses alike. Every price was locked before bids opened. Difference: + means we priced above the winning bid, − below it.

State DOTs · heavy-civil

Bid your next letting with the whole history behind you.

Try it free: 3 previews with no account, then 5 full estimates with a free account. No black boxes — just the number, and why.